Projects
Explore more about Kerrs Gold
Kerrs Gold
Strategically located in Abitibi Greenstone Belt
665ha, road accessible 90 km ENE of Timmins
Contiguous to west and south to Newmont Mining
Several periods of drilling between 1979 and 2011
Resulted in 2011 historic resource
IMR believes resource can be significantly expanded
Gowganda West
Size: 147 sq km
Access: Road, 90 minutes from Kirkland Lake
Contiguous to Aris Gold Corp. (TSX: ARIS). Juby deposit hosts 770K oz of gold (Indicated) at 1.1 g/t and 1.5 M oz @ 0.98 g/t (Inferred)*
The structures hosting the Juby deposits trend onto iMetal’s ground
Also contiguous to Orefinders/Kirkland Lake-Agnico Eagle
Explore more about Gowganda West
Explore more about Ghost Mountain Project
Ghost Mountain Project
The 100% owned, Ghost Mountain property consists of eleven claim units (eleven square kilometers) of land, that straddles the gold-prolific Destor-Porcupine Structure in Kirkland Lake, Ontario.
Carheil Project
The 100% owned Carheil project encompasses approximately 5,400 acres of contiguous land. The property is located approx. 280km NNW of Val-d’Or, Quebec and approx. 20km east of BHP Billiton Ltd’s past producing Selbai Zinc mine and 130 km North of the town of La Sarre, in the Abitibi region of Quebec
Explore more about Carheil Project